日韩精品一区二区久久,久久精品国产精品青草,久久青青草原精品亚洲,欧美变态口味重另类在线视频

全自動(dòng)涼茬機(jī)比照打茬機(jī)的優(yōu)勢

發(fā)布于:2019-06-12 15:00:44  來源:http://m.2010yyh.cn

  全自動(dòng)涼茬機(jī)比照打茬機(jī)的優(yōu)勢
  The advantage of automatic stubble cooler compared with the stubble beater
  全自動(dòng)涼茬機(jī)是一種新穎的釀酒設(shè)備,它的特點(diǎn)是速度快,效率高??勺詣?dòng)加水、下曲、出料、攪拌平均、散冷效果及其理想。每臺涼茬機(jī)都有接曲安裝組成,接曲安裝是涼茬機(jī)比擬重要的安裝之一。接曲安裝位于涼茬機(jī)的底部,構(gòu)成對下料口漏料的搜集作用,從而節(jié)約物料,防止呈現(xiàn)糜費(fèi)的現(xiàn)象。
  Fully automatic stubble cooler is a novel brewing equipment, which is characterized by fast speed and high efficiency. It can automatically add water, lower curd, discharge material, average stirring, disperse cooling effect and its ideal. Every stubble cooler has a winding installation composition, winding installation is one of the most important installations of the stubble cooler. The connection installation is located at the bottom of the stubble cooler, which can collect the material leakage from the lower inlet, thus saving material and preventing the phenomenon of wastage.
  1、在涼茬機(jī)的加曲料斗下料口正下方、處于涼茬機(jī)底部的傳動(dòng)鏈條上方設(shè)置一接曲筐;
  1. A winding basket is arranged under the lower opening of the feeding hopper of the stubble cooler and above the transmission chain at the bottom of the stubble cooler.
  2、接曲筐的兩端分別固定在涼茬機(jī)支架的橫梁上;
  2. The ends of the connecting basket are respectively fixed on the cross beam of the bracket of the stubble cooler.
  3、接曲筐為一端抬起的折型護(hù)板;
  3. The bending basket is a folded guard plate lifted at one end.
  4、且折型護(hù)板的抬起端設(shè)有調(diào)理螺栓用于調(diào)理接曲筐在橫梁上的折型高度;
  4. A conditioning bolt is arranged at the lifting end of the folding guard plate to adjust the folding height of the bending basket on the cross beam.
  5、以接曲筐構(gòu)成對加曲料斗下料口中漏料的搜集構(gòu)造。
  5. The collection structure of leaks in the outlet of the feeding hopper is formed by connecting the baskets.
  6、本適用新型能有效地對漏料停止搜集和二次應(yīng)用,從而節(jié)約物料。
  6. The new type of application can effectively stop the collection and secondary application of leaking materials, thereby saving materials.
                    全自動(dòng)涼茬機(jī)
  以上就是涼茬機(jī)的接曲安裝的特征,我們在運(yùn)用時(shí)一定要理解和熟習(xí)安裝的特征,才干更好的運(yùn)用它。
  Above is the installation characteristics of the cold stubble machine, we must understand and be familiar with the installation characteristics when using, in order to better use it.
  涼茬機(jī)比照打茬機(jī)的優(yōu)勢
  The advantage of stubble cooler over stubble beater
  全自動(dòng)涼茬機(jī),工人把出鍋后的茬子鏟入該機(jī)后,自動(dòng)加曲、加水溫度適合、自動(dòng)卸料,減少了工人勞動(dòng)強(qiáng)度。在整個(gè)涼茬過程中,茬子經(jīng)過三道拌料器,將茬子與大曲攪拌平均。
  Fully automatic stubble cooler, workers shovel stubble into the machine after out of the pot, automatically add curl, water to the temperature suitable, automatic unloading, reducing the labor intensity of workers. During the whole cold stubble process, the stubble was mixed equally with Daqu through three mixers.
  全自動(dòng)涼茬機(jī)與原始的打茬機(jī)相比,優(yōu)勢更明顯,全自動(dòng)涼茬機(jī)是在原打茬機(jī)的根底上研制出來的,原打茬機(jī)涼茬需求40-50分鐘,經(jīng)過晉級后的全自動(dòng)涼茬機(jī)僅需求20分鐘左右,大大縮短了時(shí)間,進(jìn)步了效率,縮短了工作時(shí)間。
  Compared with the original stubble beater, the advantages of the automatic stubble cooler are more obvious. The automatic stubble cooler is developed on the basis of the original stubble beater. The original stubble cooler needs 40-50 minutes. After upgrading, the automatic stubble cooler only needs about 20 minutes, which greatly shortens the time, improves the efficiency and shortens the working time.
  原打茬機(jī)整個(gè)涼茬過程,大約需求40-50分鐘,運(yùn)用全自動(dòng)涼茬機(jī),僅用20分鐘左右,縮短了時(shí)間,并且整機(jī)配用動(dòng)力小、工作時(shí)間短、節(jié)約能源、涼茬效果更佳。原公開打茬機(jī),在涼茬過程中,從畢子孔落入公開風(fēng)道的茬子約占總量的3%左右,無法收回,形成了原料直接糜費(fèi)。裝置前需求挖坑、砌墻、布置污管道等繁瑣的準(zhǔn)備工作。
  The whole stubble cooling process of the original stubble beater takes about 40-50 minutes. It only takes about 20 minutes to use the full-automatic stubble dryer, which shortens the time. The whole machine has the advantages of small power, short working time, energy saving and stubble cooling effect. The original open stubble beater, in the process of cooling stubble, the stubble falling from Bizikong into the open air duct accounted for about 3% of the total amount, which could not be recovered, resulting in direct wastage of raw materials. Before installation, it is necessary to dig holes, build walls and arrange sewage pipes.
  運(yùn)用全自動(dòng)涼茬機(jī),涼茬網(wǎng)帶漏掉的茬子直接落入本機(jī)設(shè)計(jì)的不銹鋼箱體內(nèi),清算后完整臥池應(yīng)用,清算煩瑣根絕了糜費(fèi)與污染環(huán)境現(xiàn)象。裝置前,車間空中不需任何準(zhǔn)備工作。還可依據(jù)需求,挪動(dòng)運(yùn)用。
  With the full automatic stubble cooler, the stubble leaked from the net belt of the stubble directly falls into the stainless steel box designed by the machine. After clearing, the complete bedding pool is applied, and the cumbersome clearing eliminates the waste and pollution of the environment. Before installation, no preparatory work is required in the air of the workshop. It can also be used on demand.

咨詢熱線:
0537-4556677

| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |